SAMPLE
Block PotentialDevelopment feasibility report

12 Example Street, Bateman WA 6150

Report no.BP-SAMPLEDate of issue20 November 2026
LotSample onlyRevision0, issued for information
Local governmentCity of MelvilleRules version2026-11-19
Zoning and siteR20, 860 m², 20 m frontageExisting houseAs described by the owner
BasisDesktop assessment against the published State and council rules, using the title boundary and the information supplied. No site inspection or survey.
Your best optionSubdivide, with a variationYou’re within 5% of today’s lot sizes, which the Planning Commission can approve. Not guaranteed.

General information and estimates to help you prepare, not advice for your circumstances. Confirm with your council and a licensed surveyor, and speak to a licensed financial adviser or accountant, before you commit money. Details on the last page.

StreethouseLot A ~378 m²Lot B ~482 m²20.0 m43.0 m

Today · front + rear lot

Summary of findings

OptionTodayDraft 2027
Granny flat
up to 70 m² now, 90 m² proposed
Likely no planning approval needed90 m² limit and no extra car bay, if adopted
Subdivide
R20: min 350 m², average 450 m²
Possible with a 5% variationYes, 2 lots if adopted
900 m²for 2 lots today
650 m²for 2 lots under the draft
A$31k–35kto subdivide, before surveyor

What we suggest

  1. Book a licensed surveyor for a subdivision feasibility check. Your block meets the lot-size rules today with a variation the Planning Commission must agree to, so the open questions are the layout, the existing house and service connections.
  2. Decide between a granny flat and a second lot before building anything in the back yard. A flat placed where the rear lot would go can rule out subdividing later.
  3. Confirm your inputs. Check your R-Code on PlanWA and your lot area on your certificate of title. A different code or area changes every answer in this report.

1. Granny flat

Likely no planning approval needed

A granny flat (“ancillary dwelling”) of up to 70 m² internal floor area doesn’t need planning approval when it meets every deemed-to-comply rule below. A building permit is always needed.

✓Size
70 m² is within the 70 m² internal floor area limit.
✓Open space
Your block allows 430 m² of roofed area. With about 205 m² already roofed, roughly 225 m² is left, enough for a 70 m² flat (about 81 m² to the outside of the walls).
?Outdoor living area
The main house must keep an outdoor living area of at least 30 m² after the flat is built.
?Location on the block
The flat must sit behind the street setback line (6 m from the front boundary at R20), so usually in the back yard.
?Side and rear setbacks
For a single-storey flat, walls without major windows generally need 1 m from side and rear boundaries (1.5 m for walls longer than 14 m), and 1.5 m where walls have major openings. A 70 m² flat is often about 7 × 10 m, so plan for a clear area of roughly 9 × 11.5 m.
?Parking
Unless your block is in a "Location A" area close to frequent public transport, one extra on-site car bay is required (the draft codes propose removing this).
✓City of Melville lot size
The council’s granny flat guidance still lists a 450 m² minimum lot, an older State rule removed in April 2024. Yours is 860 m², so it doesn’t matter either way.

Indicative cost and rent (Perth, November 2026)

One-bedroom granny flat, builtA$110,000–160,000
Two-bedroom granny flat, builtA$140,000–210,000
Site works and service connectionsA$15,000–40,000
Weekly rent, inner Perth (5–10 km from CBD)A$450–600
Weekly rent, middle ring (10–20 km)A$380–500
Weekly rent, outer suburbsA$300–420

Worked example: a A$175k two-bedroom build plus A$25k site works, rented at A$450 a week, earns about A$23,400 a year, a gross return of about 11.7% before rates, insurance, vacancy, maintenance and tax. Your figures will differ; get quotes.

Steps, in order

  1. Confirm your R-Code, zone and any heritage or bushfire overlay on your council’s map.
  2. Get a design that meets every rule above.
  3. If it meets them all, no development approval is needed. If not, lodge a development application with your council.
  4. Get a building permit (your builder usually arranges it).
  5. Build, then connect services.

Ask your builder

5. Red flags for this block

Nothing in what you told us, or what we looked up, stops your best option outright. The items below apply to most blocks and are quick to rule out.

RefRiskWhat it means, and what to doRating
R1Sewer lines and easementsA sewer main or an easement across the back of the block limits where you can build. Check your title and ask for the sewer diagram before designing.Check
R2Power pole, trees and crossoverA power pole on the far side of the street, a street tree where a crossover must go, or large trees on site all add cost or need approval.Check
R3AsbestosHouses and sheds built before about 1990 often contain asbestos. Any demolition needs a licensed removalist.Check